Gold Member Since 2016
Audited Supplier
Linyi Wante Machinery Co., Ltd.

Stone Coated Roof Tile, Stone Coated Roofing Sheet, Sheet Metal Roofing Installation Guide manufacturer / supplier in China, offering Aluminium Roof Tiles, Stone Coated Roof Shingles, Wante Brand Qt4-15 Concrete Interlocking Paving Block Machine for Sale, Wante Machinery Wt1-20m Interlocking Brick Machine with Mixer and so on.

(/ )

Supplier Homepage Product colorful stone coated metal roof tile Aluminium Roof Tiles, Stone Coated Roof Shingles

Aluminium Roof Tiles, Stone Coated Roof Shingles

Purchase Qty.:
(pieces)
1,000-5,999 6,000-6,999 7,000+
FOB Unit Price: US $3.4 US $3.1 US $3
Purchase Qty. (pieces) FOB Unit Price
1,000-5,999 US $3.4
6,000-6,999 US $3.1
7,000+ US $3
Get Latest Price
Production Capacity: 2000PCS/Day
Transport Package: Wood Package
Payment Terms: L/C, T/T, D/P, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Material: Color Steel Plate
  • Size: 1340*420mm
  • Customized: Customized
  • Style: Roman,Shingle,Nosen,Bond
  • Origin: China
  • Type: Double Roman Tiles
  • Color: Grey
  • thickness: 1.2-1.5mm
  • Trademark: WANTE
Product Description
 Color Stone Coated metal Roof is based on Al-Zn(Known as Zincalume or Galvalume steel)steel. The before and after protective film treatment, together With high precision pressure-shaped gravel ensure the roof to be the best roofing material. Coated With an alloy composed of Al 55%, Zn 43.4%,Si 1.6%, with Non-toxic acrylic adhesive and natural stone, Color Stone Coated metal Roof provides the advantages as follows:
1>>Aesthetic:
Two models: flat tile and circular tile, 10 optional colors. Archaize appearance, Chinese style.
2>>durable:
Can endure high temperature and low temperature, can resist bad weathers. Zinc-aluminum coating and stone chip coating can anti-corrupt effectively;
3>>sound and heat insulation:
the stone chip can reduce the sound effectively, and can hold back the heat;
4>>easy installations:
Easy to be folded, easy to cut.
5>>light in weight:
The unit weight is about 2.3-2.7kg/piece, just 1/6 as concrete/ clay tile. Easy to be transported and installed.
6>>Life long sevice:
Over 30 years sevice life
Product namestone coated roof tile
Mode                                                       Roman tile,Bond tile,Wood tile,Shingle tile
Full size1340*420mm
Cover size1280*375mm
Weight/pcs2.7kg
Cover area0.46 m2
Tiles/ m22.1pcs
Thickness1.2-1.5mm
Q:How long is the stone coated tile's sevice time?
A: The aluminum-zinc steel plate is strong the other building material.The glue spraying in surface also adopt new technology.so our roof tiles can be used for more than 50 years.
Q : Will a Steel roof make my home hot in summer?
A :No. A properly vented steel roof system moves air both between the shingles and the underlying deckas well as moving air from vents under the decking. Heated air is allowed to dissipate through the ridgelineas cooler air is drawn through eave vents. Reduced energy bills can result from airflow both under andover the decking.
Q : Can you walk on a steel roof?
A :Yes. Some care must be exercised while walking on the roof, but note that roofers walk all over the shingles during the installation process.
Q : Is stone coated metal roofing tile noisy?
A :No! The dead air space between Stone coated metal roofing Panel sand the roof decking combined with the stone coating dampens exterior noise even in a rainstorm.
Q : Is stone coated metal roofing system Heavy?
A :Stone coated roofing tiles truly lightweight! Concrete and clay roofs can weigh up to 15 lbs per squarefoot! In fact stone coated roof tile is even lighter than most high-grade asphalt roof shingles.
Q : Is stone metal roofing tile durability ?
A :Yes, The average life of a non-metal roof is 17 years. Asphalt can require re-roofing every 10 to 20years, often sooner. But a metal roofing system offers unmatched durability, lasting 2 to 3 times longer.
Q : How long does it take to install a steel roof?
A :Usually only a few days. The complexity of the buildings roofs cape is the primary factor in determiningthe time required. Complex roofs require more time than basic designs.
 
Send your message to this supplier
Avatar
Miss Grace
Manager
*From:
To: Miss Grace
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now